Standalone: The new way forward in non-domestic ventilation
Contents |
[edit] Introduction
Bars, restaurants and leisure venues are opening. Schools have welcomed back pupils. People are heading back into work. But what, in the building services and ventilation sector, will be our new normal? One thing is already clear - things are going to change.
[edit] New building regulations
We have building regulations revisions imminent that will change the way we design ventilation strategies. The ingress of external pollutants should be minimised. Ductwork should be rigid, not flexible and lengths kept to a minimum.
Approved Document Part F is looking for not just a commissioning report to show the system works adequately, but information in operation and maintenance. The interim uplift for Approved Document Part L is looking for a 27% reduction in carbon emissions per building against the existing standard.
Inevitably, protecting against COVID-19, even despite the vaccination programme, will figure in specifiers’ minds. With the best will in the world, the initial Government guidance to achieve adequate ventilation re COVID-19 of “opening windows” is not practical nor realistic as a long-term strategy alongside the global drive to cut carbon emissions and improve indoor air quality (IAQ).
[edit] System evolution
Whereas on the face of it, the industry is facing a huge amount of change, the wherewithal to deliver is already widely available and in use. Legislation is just confirming what the quality manufacturers and engineers already implement. It all combines to, I believe, an increasing use of standalone ventilation and heat recovery systems, especially those that minimise energy usage.
The latest evolution has been a hybrid-dynamic optimisation of natural ventilation, fan boosted mechanically when required. Ahead of the changes to building regulations, standalone versions have already been developed. Are these the way forward to meet our requirements?
Some hybrid systems, such as units designed to meet current regulatory guidance (eg. BB101 for schools), are standalone single-zone items, which obviates the need for ductwork, either to external or internal areas. No internal penetrations are required either, to move the air through the building, as each unit serves a dedicated zone, whether façade- or ceiling-mounted. This reduces major cost and labour in ductwork, fire dampers and silencers.
The principle therefore already overcomes the potential obstacles when the revised Approved Document F comes into force. They ventilate just the one space, preventing transfer of particulates from one zone to another and thereby minimise risk of internal cross contamination. Some already deliver flow rates compliant with latest COVID-19 guidance (i.e. to achieve a notional carbon dioxide (CO2) below 1000ppm.
CO2 is currently the metric used to check the air is ‘fresh’ within a zone. Links have been established that higher CO2 levels reflect higher COVID-19 risk.
[edit] Modular design
Within modular design products, these can be provided alongside a “mix and match” option of additions. These can be added to meet the specific use and requirements of the buildings to be ventilated.
Some options include:
- Filter modules to address fine airborne particles and maintain the IAQ within required limits.
- Connection modules to address site-specific installation limitations to allow single-sided operation.
- Heating coils that can remove the need for ancillary supplementary heating such as radiators.
- Acoustic attenuation to modulate noise below 30dBA.
- Control unit to enable easy management of the IAQ and temperature to facilitate any over ride as required. This provides capable boost and purge ventilation and night time cooling.
[edit] Get it right
The amount of change, not just in regulations, but how we use our non-domestic buildings in the future, is vast. Specifiers and designers should use the expertise of product manufacturers to their advantage. It is wise to tap this knowledge bank to ensure delivery of the best, most compliant solution for the project.
This article originally appeared on the BSRIA Blog. It was written by BSRIA member Roy Jones, Technical Director at Gilberts (Blackpool) Ltd. and published on 5 October 2021.
--BSRIA
[edit] Related articles on Designing Buildings
- Air tightness.
- Approved documents.
- Approved Document F.
- Approved document L.
- Back to the workplace: are you prepared?
- BSRIA articles on Designing Buildings Wiki.
- Building Regulations.
- Building ventilation and COVID-19 transmission risk.
- IAQ developments accelerated by COVID-19.
- Indoor air quality.
- Single-sided ventilation.
- Ventilation.
- Ventilation and control of COVID-19 transmission.
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.